Agenda item

21/00871/FUL

Construct 3 storey building comprising 9 student apartments (Use Class C4) (Revised Scheme)

The Raven Group, Ellis Grove, Beeston NG9 1EP

 

Minutes:

Construct 3 storey building comprising 9 student apartments (Use Class C4) (Revised scheme)

The Raven Group, Ellis Grove, Beeston, NG9 1EP

 

The application was brought to the Committee because it was a revised from a similar scheme that the Committee refused permission for on 1 September 2021.

 

The Committee noted that a late item in the form of an additional objection regarding the number of parking spaces had been received.

 

There were no public speakers on the application.

 

It was noted that any windows that overlooked existing properties were to be obscurely glazed as per the conditions.

 

       RESOLVED that planning permission be granted subject to the following conditions:

 

1.

The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission.

 

Reason: To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004.

 

2.

The development hereby permitted shall be carried out in accordance with drawing number 456 002 rev L and drawing number 456 004 rev G received by the Local Planning Authority on 15.10.21, and drawing number 456 003 rev F (includes site location plan) received by the Local Planning Authority on 10.12.21.

 

Reason: For the avoidance of doubt.

 

3.

Prior to the commencement of development, an investigative survey of the site shall first have been carried out and a report submitted to and approved in writing by the Local Planning Authority. The survey must have regard for any potential ground and water contamination, the potential for gas emissions and any associated risk to the public, buildings and / or the environment. The report shall include details of any necessary remedial measures to be taken to address any contamination or other identified problems.

 

b) No building to be erected pursuant to this permission shall be first occupied or brought into use until:

i) all the necessary remedial measures have been completed in accordance with the approved details, unless an alternative has first been approved in writing by the Local Planning Authority; and

ii) it has been certified to the satisfaction of the Local Planning Authority that the necessary remedial measures have been implemented in full and that they have rendered the site free from risk to human health from the contaminants identified, unless an alternative has first been approved in writing by the Local Planning Authority.

 

The approved measures shall be retained for the lifetime of the development.

 

Reason: In the interests of public health and safety and in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

4.

Prior to the commencement of development, details of a report, prepared in accordance with the provisions of the current BS4142 shall first have been submitted to and approved in writing by the Local Planning Authority. Predictions shall be contained in the report which sets out: a large scale plan of the proposed development; noise sources and measurement/prediction points marked on a plan; a list of noise sources; a list of assumed noise emission levels; details of noise mitigation measures; description of noise calculation procedures; noise levels at a representative sample of noise sensitive locations; a comparison of noise level with appropriate criteria. Where criteria are exceeded at any location the applicant should explain why that excess is immaterial or what further mitigation will be undertaken to ensure that criteria will be met. The development shall thereafter be constructed in accordance with the approved details and retained for the lifetime of the development.

 

Reason: In the interests of public health and safety and in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

5.

Prior to the commencement of development, details of a Construction / Demolition Method Statement shall first have been submitted to and approved in writing by the Local Planning Authority. The statement shall include:

 

The means of access for construction traffic;

Parking provision for site operatives and visitors;

The loading and unloading of plant and materials;

The storage of plant and materials used in construction / demolition of the development;

A scheme for the recycling/disposal of waste resulting from construction / demolition works; and

Details of dust and noise suppression to be used during the construction phase.

The details as approved shall be adhered to throughout the construction / demolition period.

 

Reason: In the interests of public health and safety and in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

6.

No above ground works shall be carried out until details of the manufacturer, type and colour of the bricks, cladding, window and door frames and external guttering to be used in facing elevations have been submitted to and approved in writing by the Local Planning Authority, and the development shall be constructed only in accordance with those details.

 

Reason: Limited details were submitted and to ensure the development presents a satisfactory standard of external appearance, in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

7.

No above ground works shall take place until a landscaping scheme has been submitted to and approved by the Local Planning Authority.  This scheme shall include the following details:

(a)      numbers, types, sizes and positions of any proposed trees

          and shrubs
(b)      proposed boundary treatments
(c)      proposed hard surfacing treatment
(d)      planting, seeding/turfing of other soft landscape areas

The approved scheme shall be carried out strictly in accordance with the agreed details.

 

Reason: Limited details were submitted and to ensure that the details are satisfactory in the interests of the appearance of the area and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

8.

Prior to the installation of any external lighting associated with the development, details, which need to include and Artificial Lighting Assessment (including design, size and illuminance) in line with the current guidance from the Institute of Lighting Professionals Lighting Guide reference 01/20 guidance note for the reduction of intrusive light, shall first have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in accordance with the approved details.

 

Reason: In the interests of public health and safety and in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

9.

No part of the development hereby permitted shall be brought into first use until the parking and turning areas as approved have been provided. These areas shall thereafter not be used for any other purpose and shall be retained for the lifetime of the development.

 

Reason: In the interests of highway safety in accordance with Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

10.

No part of the development hereby permitted shall be brought into first use until the areas to the frontage have been surfaced in a suitable hard bound material (not loose aggregate) and constructed with provision to prevent the discharge of third party surface water to the public highway, and retained as such for the lifetime of the development.

 

Reason: In the interests of highway safety in accordance with Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

11.

No part of the development hereby permitted shall be brought into first use until a 2m wide footway as shown indicatively on drawing 002 revision L has been provided along the site frontage.

 

Reason: In the interests of highway safety in accordance with Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

12.

No construction or site preparation works in association with this permission shall be undertaken outside the hours of 08.00 and 18.00 hours Monday to Friday, 08.00 and 13.00 hours on Saturdays and at no time on Sundays and Bank Holidays.

 

Reason: In the interests of public health and safety and in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

13.

The approved landscaping shall be carried out not later than the first planting season following the substantial completion of the development or occupation of the building, whichever is the sooner and any trees or plants which, within a period of 5 years, die, are removed or have become seriously damaged or diseased shall be replaced in the next planting season with ones of similar size and species to the satisfaction of the Local Planning Authority, unless written consent has been obtained from the Local Planning Authority for a variation.

 

Reason: To ensure the development presents a more pleasant appearance in the locality and in accordance with Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

14.

The windows on the south west elevation at first and second floor level shall be obscurely glazed to Pilkington Level 4 or 5 (or such equivalent glazing which shall first have been agreed in writing by the Local Planning Authority) and non-opening unless the parts of the windows that can be opened are more than 1.7m above the floor of the room in which it is installed and retained in this form for the lifetime of the development.

 

Reason: In the interests of privacy and amenity for nearby residents and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

 

Supporting documents: