Agenda item

20/00478/FUL

Construct 78 bed residential care home with associated parking

Site of The Magpie, Toton Lane, Stapleford NG9 7JD

Minutes:

Construct 78 bed residential care home with associated parking

Site of The Magpie, Toton Lane, Stapleford NG9 7JD

 

The application had been deferred by the Committee on 10 November 2020 to allow the developer to address concerns regarding the number of car parking spaces. 

 

The Committee considered the late item which was an additional condition in response to comments received from the Highways Authority, making a Travel Plan a requirement as the site was to provide employment for more than 20 staff.    

 

There were no public speakers in respect of the application.

 

The Committee considered the addition of ten parking spaces to the proposed development and it was noted that should there be any deviation from the application as approved, enforcement proceedings could be brought.

 

RESOLVED that planning permission be granted subject to the following conditions.

 

1.    The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission.

 

Reason: To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004.

 

2.    The development hereby permitted shall be carried out in accordance with the site location plan and drawings numbered 2621(08)201 rev C, 2621(08)301 rev B, 2621(08)902, 2621(08)E02 rev A, and 2621(08)S02 rev A, received by the Local Planning Authority on 23.07.20, drawing numbered 2621(08)E01 rev B received by the Local Planning Authority on 07.08.20, drawing number ADC2521-DR-001-P1, Technical note and Travel Plan Statement received by the Local Planning Authority on 15.10.20, drawing number 2621(08) G01 rev G, ADC2521-DR-051-P2, ADC2521-DR-052-P2 received by the Local Panning Authority on 13.11.20. Drawings numbered 2621(08)101 rev D, 2621(08)901 rev B, and 2621(08)S01 rev B received by the Local Panning Authority on 18.11.20.

 

Reason: For the avoidance of doubt.

 

3.    No above ground works shall be carried out until details of the manufacturer, type and colour of the bricks and tiles to be used in all elevations have been submitted to and approved in writing by the Local Planning Authority, and the development shall be constructed only in accordance with those details.

 

Reason: Limited details were submitted and to ensure the development presents a satisfactory standard of external appearance, in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

4.    The development shall not be commenced until an investigative survey of the site has been carried out and a report submitted to and approved in writing by the Local Planning Authority. The survey must have regard for any potential ground and water contamination, the potential for gas emissions and any associated risk to the public, buildings and / or the environment. The report shall include details of any necessary remedial measures to be taken to address contamination or other identified problems. The building shall not be occupied or brought into use until all necessary measures have been implemented in accordance with the approved details.

 

Reason: In the interests of public safety, in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

5.    No above ground works shall be commenced until details of the proposed bin storage area and cycle store have been submitted to and approved in writing by the Local Planning Authority. The stores shall be installed in accordance with the approved details, prior to the first use of the building, and retained for the lifetime of the development.

 

Reason: Limited details were submitted and to ensure that the details are satisfactory in the interests of the appearance of the area and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

6.    The residential care home shall not be brought into use until a

landscaping scheme has been submitted to and approved in

writing by the Local Planning Authority.  This scheme shall

include the following details:

 

(a)   numbers, types, sizes and positions of proposed trees and shrubs

(b)   proposed hard surfacing treatment

(c)   proposed lighting details

(d)   planting, seeding/turfing of other soft landscape areas

 

The approved scheme shall be carried out strictly in accordance with the agreed details.

 

Reason: Limited details were submitted and to ensure that the details are satisfactory in the interests of the appearance of the area and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

7.    The building shall not be occupied until details of ventilation and filtration equipment, required to supress and disperse odour created from food preparation on the premises, have been submitted to and approved in writing by the Local Planning Authority. The approved equipment shall be installed prior to first use of the premises, and shall be effectively operated and maintained for the lifetime of the development.

 

Reason: In the interest of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

8.    The building shall not be occupied or otherwise be brought into use until the noise mitigation measures as detailed in section 4 of the Noise Assessment report, reference 13016.01 v1 dated June 20, have been implemented. The measures shall thereafter be retained for the lifetime of the development.

 

Reason: In the interests of the amenities of future residents and in accordance with the aims of Policy 19 of the Broxtowe Part 2 Local Plan (2019).

 

9.    The building shall not be occupied or otherwise be brought into use until the access drive, parking and turning areas have been surfaced in a bound material and constructed with provision to prevent the unregulated discharge of surface water from the access on to the public highway, and shall be retained as such for the lifetime of the development.

 

Reason: In the interests of highway safety and in accordance with the aims of aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

10.  The building shall not be occupied or otherwise brought into use until the parking and turning area (which shall be clearly delineated); the electric vehicle charging points; and visibility splays have been installed / completed in accordance with the approved plans. The visibility splays shall thereafter be kept free of all obstructions for the lifetime of the development.

 

Reason: In the interests of highway safety and in accordance with

Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of

the Aligned Core Strategy (2014).

 

11.  The building shall not be occupied or otherwise brought into use until details of a bin collection point within 15m of the public highway have first been submitted to and approved in writing by the Local Planning Authority.

 

Reason: In the interests of highway safety and in accordance with the aims of aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

12.  The approved landscaping shall be carried out not later than the first planting season following the substantial completion of the development or occupation of the building(s), whichever is the sooner and any trees or plants which, within a period of 5 years, die, are removed or have become seriously damaged or diseased shall be replaced in the next planting season with ones of similar size and species to the satisfaction of the Local Planning Authority, unless written consent has been obtained from the Local Planning Authority for a variation.

 

Reason: To ensure the development presents a more pleasant appearance in the locality and in accordance with Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

13. The building shall not be occupied or otherwise brought into use until details of a full Travel Plan have been submitted to and approved in writing by the Local Planning Authority. The Travel Plan shall set out proposals (including targets, a timetable and enforcement mechanism) to promote travel by sustainable modes and shall include arrangements for monitoring of progress of the proposals. The Travel Plan shall be implemented in accordance with the timetable set out in the plan as approved.

 

Reason: In the interests of promoting sustainable travel, and in the interests of highway safety and in accordance with the aims of aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

      

NOTES TO APPLICANT

 

1.    The Council has acted positively and proactively in the determination of this application by working to determine it within the agreed determination timescale.

 

2.    As this permission relates to the creation of a new unit(s), please contact the Council’s Street Naming and Numbering team: 3015snn@broxtowe.gov.uk to ensure an address(es) is(are) created.  This can take several weeks and it is advised to make contact as soon as possible after the development commences. A copy of the decision notice, elevations, internal plans and a block plan are required. For larger sites, a detailed site plan of the whole development will also be required.

 

3.    Given the proximity of residential properties, it is advised that contractors limit noisy works to between 08.00 and 18.00 hours Monday to Friday, 08.00 and 13.00 hours on Saturdays and no noisy works on Sundays and Bank Holidays. There should also be no bonfires on site at any time.

 

4.    The applicant is advised to contact the Food and Occupational Safety Section of Broxtowe Borough Council on 0115 9173435 to ensure that the premises complies with current Food Safety requirements.

 

5.    The development makes it necessary to amend and reinstate the vehicular crossing over a footway of the public highway. These works shall be constructed to the satisfaction of the Highway Authority.  Works will be subject to a design check and site inspection for which a fee will apply. The application process can be found at:

http://www.nottinghamshire.gov.uk/transport/licences-permits/temporary-activities

 

 