Agenda item

26/00554/REG3

Construct 3 storey building with 6 no. apartments, associated landscaping and access

Land off Cross Street, Eastwood

Minutes:

Construct 3 storey building with 6 no. apartments, associated landscaping and access

Land off Cross Street, Eastwood

 

This application was brought to the Committee as it is a Council application.

 

There were public no speakers for this application.

 

There were late items comprising of further comments that an arboricultural report and Arboricultural Implications Assessment (AIA) had been submitted and reviewed by the Council’s Tree Officer and no objections had been provided. The recommendations in the submitted AIA included tree protections measures that would be adhered to during the development to protect the two neighbouring highway trees.

 

The Committee opened the debate, which covered that the proposed housing tenure would be social rent Council flats comprising 4 x 1 bedroom and 2 x 2-bedroom dwellings. It was noted that the proposed development was appropriate for the area.

 

RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant advertisement consent subject to:

 

1.The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission.

 

Reason: To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004.

 

2.The development hereby permitted shall be carried out in accordance with drawings received by the Local Planning Authority on the following dates:

 

•   Proposed cycle store No. 10 P01

•   Roof GA plan No. 104 P01

•   Site Location Plan No. 01 P01

 

(Received by the Local Planning Authority 10/08/26)

 

•   Level 00 GA plan No. 101 P02

 

(Received by the Local Planning Authority 21/08/26)

 

•   Proposed Site Plan No. 05 P03

•   Level 01 GA plan No. 102 P02

•   Level 02 GA plan No. 103 P02

•   Proposed bin store No. 09 P02

•   Proposed Elevations No. 201 P02

 

(Received by the Local Planning Authority 15/09/26)

 

Reason: For the avoidance of doubt.

 

3.No development hereby approved shall take place until:

 

•     An updated site investigation strategy in accordance with the submitted Desk Study report Ref MI-26-061, has been submitted to and approved in writing by the Local Planning Authority.

•     The submitted site investigation strategy shall be undertaken by a competent person in accordance with the current UK requirements for sampling and analysis. Where the site investigation identifies unacceptable levels of contamination, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment shall be submitted. The submitted scheme shall have regard to relevant current guidance. The approved scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria and site management procedures.

•     The developer shall give at least 14 days’ notice to the Local Planning Authority (Environmental Health Division) prior to commencing works in connection with the remediation scheme.

•     If during the construction and/or demolition works associated with the development hereby approved any suspected areas of contamination are discovered, then all works shall be suspended until the nature and extent of the contamination is assessed and a report submitted and approved in writing by the local planning authority.

 

The development shall be carried out in accordance with the approved site investigation strategy and any required remediation measures.

 

Reason: To protect future occupiers from land contamination in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

4.No development hereby approved shall take place until an environmental noise assessment has been submitted to and approved in writing by the Local Planning Authority. The assessment shall rate and assess sound from any relevant commercial and manufacturing processes; fixed installations comprising mechanical and electrical plant; and from the loading and unloading of goods and material in accordance with the methodology in British Standard (BS) 4142:2014 + A1:2019 ‘Methods for rating and assessing industrial and commercial sound’.

 

Reason: To protect future occupants from excessive environmental noise in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

3.No development hereby approved shall take place until a Construction/Demolition Method Statement has been submitted to and approved in writing by the Local Planning Authority.  The statement shall include:

 

a) The means of access for construction traffic;

b) Parking provision for site operatives and visitors;

c) The loading and unloading of plant and materials;

d)The storage of plant and materials used in construction/demolition of the development;

e) A scheme for the recycling/disposal of waste resulting from construction/demolition works;

f) Details of dust and noise suppression to be used during the construction phase and;

 

The approved statement shall be adhered to throughout the demolition/construction period.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

4.No above ground works shall commence until samples of external facing and materials have been submitted to and approved in writing by the Local Planning Authority. The development shall be constructed only in accordance with the approved details.

 

Reason: To ensure the development presents a satisfactory standard of external appearance, in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

5.No development above slab level shall commence until a landscaping scheme has been submitted to and approved by the Local Planning Authority. This scheme shall include the following details:

 

(a) trees, hedges and shrubs to be retained and measures for their protection during the course of development

(b) numbers, types, sizes and positions of proposed trees and shrubs

(c) proposed boundary treatments

(d) proposed hard surfacing treatment

(e) proposed external lighting details

(f) planting, seeding/turfing of other soft landscape areas

 

The approved scheme shall be carried out strictly in accordance with the agreed details.

 

Reason: To ensure the development presents a more pleasant appearance in the locality and in accordance with Policies 10 and 17 of the Broxtowe Aligned Core Strategy (2014) and Policies 17 and 31 of the Broxtowe Part 2 Local Plan (2019).

 

6.No part of the development hereby permitted shall be brought into use until:

 

•   Any approved remediation works have been carried out in full compliance with the approved methodology and best practice.

•   Upon completion of any required remediation works, a validation report prepared by a competent person shall be submitted to and approved in writing by the local planning authority. The validation report shall include details of the remediation works and Quality Assurance/Quality Control results to show that the works have been carried out in full and in accordance with the approved methodology. Details of any validation sampling and analysis to show the site has achieved the approved remediation standard, together with the necessary waste management documentation shall be included.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

7.No part of the development hereby permitted shall be brought into use until a dropped vehicular footway crossing is available for use and constructed in accordance with the Highway Authority specification to the satisfaction of the Local Planning Authority.

 

Reason: In the interests of highway safety and in accordance with the aims of Policy 17 Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

8.No part of the development hereby permitted shall be brought into use until the access/parking area is constructed with provision to prevent the unregulated discharge of surface water from the access/parking area to the public highway in accordance with details first submitted to and approved in writing by the LPA. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development.

 

Reason: In the interests of highway safety and in accordance with the aims of Policy 17 Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

9.No part of the development hereby permitted shall be brought into use until the parking and turning areas are surfaced in a bound material with the parking bays clearly delineated in accordance with drawing number 6988-SSA-00-XX-DR-A-0005-P03. The parking and turning areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking and turning of vehicles.

 

Reason: In the interests of highway safety and in accordance with the aims of Policy 17 Policy 17 of the Broxtowe Part 2 Local Plan (2019).

 

10.No part of the development hereby permitted shall be brought into use until the bin store/collection point has been constructed and positioned in accordance with drawing number 6988-SSA-00-XX-DR-A-0005-P03.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

11.No construction or site preparation work in association with this permission shall be undertaken outside the hours of 08:00-18:00 Monday to Friday, 08:00-13:00 on Saturdays and at no time on Sundays or Bank Holidays.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

Notes to Applicant

 

1.The Council has acted positively and proactively in the determination of this application by working to determine it within the agreed determination timescale.

 

2.As this permission relates to the creation of new units, please contact the Council's Street Naming and Numbering team: 3015snn@broxtowe.gov.uk to ensure an address or addresses are created.  This can take several weeks and it is advised to make contact as soon as possible after the development commences. A copy of the decision notice, elevations, internal plans and a block plan are required. For larger sites, a detailed site plan of the whole development will also be required.

 

3.The proposal makes it necessary to construct a vehicular crossing over a footway of the public highway. These works shall be constructed to the satisfaction of the Highway Authority. You are, therefore, required to contact the County Council’s Customer Services to arrange for these works on telephone 0300 500 80 80.to arrange for these works to be carried out, or alternatively the application process can be found at: http://www.nottinghamshire.gov.uk/transport/licences-permits/temporary-activities

 

 

Supporting documents: