Agenda item

26/00555/REG3

Conversion and refurbishment former residential care home to provide five self-contained dwellings (C3) - including demolition of existing rear conservatory and construction of replacement single storey rear extension, new side extension to accommodate a new staircase, internal and external alterations, provision of new bin and cycle storage and associated landscaping.

Church Street Care Home. 84 Church Street, Eastwood

Minutes:

Conversion and refurbishment former residential care home to provide five self-contained dwellings (C3) - including demolition of existing rear conservatory and construction of replacement single storey rear extension, new side extension to accommodate a new staircase, internal and external alterations, provision of new bin and cycle storage and associated landscaping.

Church Street Care Home. 84 Church Street, Eastwood

 

The application was brought to the Planning Committee as the Council is the applicant.

 

There were no late items.

 

There were no public speakers for this application.

 

The Committee opened the debate, which covered that the benefits of the proposal would include that five additional family homes would built, with one of them accessible, within a sustainable, urban location with access to shops,

schools and public open spaces.

 

RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission subject to:

 

1.  The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission.

 

Reason: To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004.

 

2.  The development hereby permitted shall be carried out in accordance with the following plans received by the Local Planning Authority on 19 August 2026:

 

·     Site Location Plan Revision CO2 (Drawing no. 7060-SSA 01-V1 DR-A-000 A3)

·     Ground Floor Demolition Revision C02 (Drawing no. 7060-SSA 05-V1 DR-A-100 A3)

·     First Floor Demolition Revision C02 (Drawing no. 7060-SSA 05-V1 DR-A-102 A3)

·     Proposed First Floor Layout Revision C02 (Drawing no. 7060-SSA 20-V1 DR-A-101 A3)

·     Proposed Roof Plan Revision C02 (Drawing no. 7060-SSA 20-V1 DR-A-102 A3)

·     The Drainage Strategy Revision P01 (Drawing no. 26113-HWC-26-00-DR-C-2000 received by the Local Planning Authority on 21 August 2026

 

 

 

The following plans received by the Local Planning Authority on 24 August 2026:

 

·     The Proposed Elevations Revision C03 (Drawing no. 7060-SSA 20-V1 DR-A-200 A3)

·     Proposed Bin Storage and Bicycle Shelter Plan Revision C03 (Drawing no. 7060-SSA 90-V1 DR-A- A3),and the following plans received by the Local Planning Authority on 25 September 2026:

·     Proposed Block Plan Revision C02 (Drawing no. 7060-SSA 01-V1 DR-A-002 A3)

·     Proposed Ground Floor Plan Revision C04 (Drawing no. 7060-SSA 20-V1 DR-A-100 A3)

·     Proposed Site Plan Revision C03 (Drawing no. 7060-SSA 90-V1 DR-A-001 A3)

 

Reason: For the avoidance of doubt.

 

3.  The proposed extensions shall be constructed using the materials annotated on the approved plans unless otherwise agreed in writing by the Local PlanningAuthority.

 

Reason: To ensure a satisfactory standard of external appearance and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

4.  a)No partof thedevelopment herebyapproved shallbe commenceduntil aninvestigative surveyof thesite hasbeen carriedout anda reportsubmitted toand approvedin writingby theLocal PlanningAuthority. Thesurvey musthave regardfor anypotential groundand watercontamination, thepotential forgas emissions andany associatedrisk tothe public,buildings and/orthe environment.The reportshall includedetails of anynecessary remedialmeasures to betaken toaddress anycontamination orother identifiedproblems.

 

b) No building to be erected pursuant to this permission shall be occupied or brought into use until: -

 

All necessary remedial measures have been completed in accordance with details approved in writing by the local planning authority; and

 

It has been certified to the satisfaction of the local planning authority that necessary remedial measures have been implemented in full and that they have rendered the site free from risk to human health from the contaminants identified.

 

Reason: in the interest of public health and safety, in accordance with Policy 19 of the Broxtowe Part 2 Local Plan (2019).

5.  No development within the full planning permission phase hereby approved shall take place until a Construction / Demolition Method Statement has been submitted to and approved in writing by the Borough Council. The statement shall include:

 

·     The means of access for constructiontraffic;

·     parking provision for site operatives andvisitors;

·     the loading and unloading of plant andmaterials;

·     the storage of plant and materials used in construction / demolition thedevelopment;

·     a scheme for the recycling/disposal of waste resulting from construction / demolition works;and

·     details of dust and noise suppression to be used during the constructionphase.

·     Details of a scheme for the identification and safe removal of asbestos containing material The approved statement shall be adhered to throughout the constructionperiod.

 

Reason To protect the amenity of neighbouring residents and in accordance with the aims of Policies 17 and 19 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

6.  Duringthe constructionworks, nomaterials, equipment,machinery, temporarybuildings orsurplus soilshall beplaced orstored beneaththe branchesof thetrees protectedby aTree PreservationOrder, andno oil,bitumen, cementor othermaterials likelyto beinjurious toa treeshall bedischarged within10 metresof the trunk.If anytrenches forservices arerequired withinthe canopyareas, theyshall beexcavated andback- filledby handand anytree rootsencountered witha diameterof 25mm(1 inch)or moreshall beleft unsevered.

 

Reason: To ensure that trees protected by a Tree Preservation Order are not adversely affected and in accordance with Policy 31 of the Broxtowe Part 2 Local Plan (2019).

 

7.  The erection of fencing for the protection of the preserved trees shall be undertaken and shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within thoseareas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.

 

Reason: To ensure that trees protected by a Tree Preservation Order are not adversely affected and in accordance with Policy 31 of the Broxtowe Part 2 Local Plan (2019).

 

8.  No part of the development hereby permitted shall be brought into use until the access, parking and turning areas are surfaced in a hard-bound material (not loose gravel) for a minimum of 5.5 metres behind the Highway boundary and the parking bays clearly delineated in accordance with drawing number 7060-SSA- 90-V1 DR-A-001-A3-CO3. The surfaced access drive shall thereafter be maintained in such hard-bound material for the life of the development and shall not be used for any purpose other than the parking, turning and loading and unloading ofvehicles.

 

Reason: In the interests of highway safety in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

9.  No part of the development hereby permitted shall be brought into use until the access driveway / parking / turning areas have been constructed with provision to prevent the unregulated discharge of surface water from the driveway/parking/turning areas to the public highway. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of thedevelopment.

 

Reason: To ensure surface water from the site is not deposited on the public highway causing dangers to road users and in accordance with the aims of Policy 17 of the Broxtowe Part 2 Local Plan (2019) and Policy 10 of the Aligned Core Strategy (2014).

 

10.   Priorto installation,an assessment ofthe potentialnoise impactsat thenearby residentialpremises arisingfrom theuse offive airsource heatpumps shallbe carriedout usingthe methodologydescribed withinBS 4142:2014.Where thisassessment indicatesthat thenoise ratinglevel willexceed thebackground noiselevel by5dB(A) or more,details ofthe noisemitigation measuresto betaken shallbe submittedto thelocal planning authorityfor prior approval.

 

Following approval, the approved noise mitigation measures shall be implemented before the equipment is first operated and shall thereafter be maintained.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014).

 

11.   No constructionor sitepreparation workin associationwith thispermission shallbe undertakenoutside thehours of08.00 to18.00 Mondayto Friday,08.00 to13.00 Saturdayand atno timeon Sundaysor Bank/ public holidays.

 

Reason: In the interests of the amenities of nearby residents and in accordance with the aims of Policy 19 of e Part 2 Local Plan (2019).

 

Notes to applicant

 

1.  TheCouncil hasacted positivelyand proactivelyin thedetermination ofthis applicationby workingto determineit withinthe agreeddetermination timescale.

 

2.  The proposed development lies within an area that has been defined by the Mining Remediation Authority as containing coal mining features at surface or shallow depth. These features may include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be presentand problems can occur, particularly as a result of new development taking place.

 

Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Mining Remediation Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure a suitable engineering design which takes account of all relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Mining Remediation Authority Policy in relation to new development and mine entries available at: Building on or within the influencing distance of mine entries - GOV.UK

 

Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Mining Remediation Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Application forms for Mining Remediation Authority permission and further guidance can be obtained from The Mining Remediation Authority's website at: www.gov.uk/get-a-permit-to-deal-with-a-coal-mine-onyour-property What is a permit and how to get one? - GOV.UK (www.gov.uk)

 

In areas where shallow coal seams are present caution should be taken when carrying out any on site burning or heat focused activities.

 

If any future development has the potential to encounter coal seams which require excavating, for example excavation of building foundations, service trenches, development platforms, earthworks, noncoal mineral operations, an Incidental Coal Agreement will be required. Further information regarding Incidental Coal Agreements can be found here - https://www.gov.uk/government/publications/incidentalcoal- agreement/guidance-notes-for-applicants-for-incidental-coal-agreements

 

If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Mining Remediation Authority on 0800 288 4242. Further information is available on the Mining Remediation Authority website at: Mining Remediation Authority - GOV.UK

 

3.  Burningof commercialwaste is aprosecutable offence.It alsocauses unnecessary nuisanceto thosein the locality.All waste shouldbe removedby anappropriately licensedcarrier.

 

4.  Theapplicant shouldbe awarethat therequirement forlimiting thetransmission ofnoise betweeneach residentialunit ofaccommodation and/orany otherpart ofthe buildingwhich isnot exclusivelyused asa unit ofaccommodation, shallcomply with thecurrent Approved DocumentE.

 

5.  As this permission relates to the creation of a new unit(s), please contact the Council's Street Naming and Numbering team: 3015snn@broxtowe.gov.uk to ensure an address(es) is(are) created. This can take several weeks and it is advised to make contact as soon as possible after the development commences. A copy of the decision notice, elevations, internal plans and a block plan are required. For larger sites, a detailed site plan of the whole development will also berequired.

 

6.  Notice will be served on the developer to purchase the first time provision of bins. The resident will need to place bins at the curtilage of the property for collection. For more information please emailrecycling@broxtowe.gov.uk

 

Supporting documents: