Demolition of existing changing pavilion and construct community leisure pavilion together with associated external works including installation of MUGA
Pavilion, Hickings Lane Recreation Ground, Hickings Lane, Stapleford, Nottinghamshire
Minutes:
Demolition of existing changing pavilion and construct community leisure pavilion together with associated external works including installation of MUGA and replacement of skate park with community garden.
Pavilion, Hickings Lane Recreation Ground, Hickings Lane, Stapleford, Nottinghamshire
The application was brought to the Committee because the applicant is the Council.
There were a number of late items for the Committee to consider, including an objection from Sport England, objections from a resident and a community group and a number of corrections to the report.
Jonathon Little, on behalf of the applicant and Richard Kane, objecting, made representation to the Committee prior to the general debate.
Having given due weight to all the representations made to the Committee debate focused on the importance of investing in Stapleford, and balancing that with the changes that had been made to the proposal due to building costs. There was concern about possible sites for the relocation of the Cricket Club and it was noted that there was a condition pertaining to this.
RESOLVED that planning permission be granted subject to the following conditions:
1. |
The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission.
Reason: To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004.
|
2. |
The development hereby permitted shall be carried out in accordance with the following plans:
· Site Location Plan · Utility Survey 45652_T_UG Rev. 0 · Topographical Survey 45652_T Rev. 0 · Existing Site Plan 0101 Rev. P02 · Existing Building 0016 Rev. P01
(All received by the Local Planning Authority 19/01/23)
· Proposed Floor Plans 0010 Rev. P06 · Proposed Roof Level Plan 0012 Rev. P04 · Proposed Elevations 0015 Rev. P05
(All received by the Local Planning Authority 04/05/23).
· Proposed Site Plan 0102 Rev. P06
(Received by the Local Planning Authority 25/05/23).
Reason: For the avoidance of doubt.
|
3. |
No development above slab level shall commence until samples/details of the proposed external facing materials have been submitted to and agreed in writing by the Local Planning Authority and the development shall be constructed only in accordance with those details.
Reason: To ensure the satisfactory appearance of the development in accordance with Policy 10 – Design and Enhancing Local Identity of the Aligned Core Strategy Part 1 Local Plan 2014 and Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
4. |
a) No part of the development hereby approved shall be commenced until an investigative survey of the site has been carried out and a report submitted to and approved in writing by the Local Planning Authority. The survey must have regard for any potential ground and water contamination, the potential for gas emissions and any associated risk to the public, buildings and/or the environment. The report shall include details of any necessary remedial measures to be taken to address any contamination or other identified problems.
b) No building to be erected pursuant to this permission shall be occupied or brought into use until:-
(i) All necessary remedial measures have been completed in accordance with details approved in writing by the local planning authority; and
(ii) It has been certified to the satisfaction of the local planning authority that necessary remedial measures have been implemented in full and that they have rendered the site free from risk to human health from the contaminants identified.
Reason: In the interest of public health and safety in accordance with Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
5. |
No above ground works shall take place until a landscaping scheme has been submitted to and approved by the Local Planning Authority. This scheme shall include the following details:
(a) numbers, types, sizes and positions of proposed trees and shrubs (b) proposed boundary treatments (c) proposed hard surfacing treatment (d) proposed lighting details (e) planting, seeding/turfing of other soft landscape areas (f) proposed retaining walls or similar structures
The approved scheme shall be carried out strictly in accordance with the agreed details.
Reason: Limited details were submitted and to ensure that the details are satisfactory in the interests of the appearance of the area and in accordance with Policy 10 - Design and Enhancing Local Identity of the of the Aligned Core Strategy Part 1 Local Plan 2014 and Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
6. |
Prior to the commencement of the development, a detailed Landscape and Ecological Management Plan shall be submitted to and approved and by the Local Planning Authority. The Landscape and Ecological Management Plan shall include enhancement measures and habitat creation. The development shall be implemented in accordance with the approved Landscape and Ecological Management Plan unless otherwise agreed in writing by the Local Planning Authority.
Reason: In the interests of securing an environmental net gain in accordance with Policy 17 - Biodiversity of the Broxtowe Aligned Core Strategy Part 1 Local Plan 2014 and Policy 31 - Biodiversity Assets of the Broxtowe Part 2 Local Plan 2019.
|
7. |
No development within the full planning permission phase hereby approved shall take place until a Construction / Demolition Method Statement has been submitted to and approved in writing by the Borough Council. The statement shall include:
a) The means of access for construction traffic; b) parking provision for site operatives and visitors; c) the loading and unloading of plant and materials; d) the storage of plant and materials used in construction / demolition the development; e) a scheme for the recycling/disposal of waste resulting from construction / demolition works; and f) details of dust and noise suppression to be used during the construction phase. g) a scheme for the identification and safe removal of asbestos containing material.
The approved statement shall be adhered to throughout the construction period.
Reason: To protect the amenity of neighbouring residents in accordance with Policy 10 – Design and Enhancing Local Identity of the Aligned Core Strategy Part 1 Local Plan 2014 and Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
8. |
Prior to the commencement of any development that may affect the use of the cricket pitch, a cricket club relocation plan shall be submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure suitable relocation of the cricket club is secured in accordance with the aims within Part 8 - Promoting healthy and safe communities of the of the National Planning Policy Framework 2021.
|
9. |
Prior to the commencement of the development, a detailed renewable energy and sustainability management plan shall be submitted to and approved by the Local Planning Authority. Details should include the siting, design and required maintenance of any renewable energy structures. The renewable energy and sustainability management plan shall be in accordance with the recommendations contained within the Energy Statement dated 12th May 2023.
Reason: In the interests of sustainability in accordance with Policy 1 - Climate Change of the Aligned Core Strategy Part 1 Local Plan 2014 and Part 14 - Meeting the challenge of climate change, flooding and coastal change of the NPPF 2021.
|
10. |
Suitable ventilation and filtration equipment shall be installed to suppress and disperse odour created from food preparation operations on the premises. The equipment shall be effectively operated and maintained in accordance with manufacturer’s instructions for as long as the proposed use continues. Details of the equipment shall be submitted to and approved by the Local Planning Authority prior to the installation of the any ventilation and filtration equipment. Equipment shall be installed and in full working order to the satisfaction of the Local Planning Authority prior to the commencement of use.
Reason: To protect nearby occupiers from excessive odour in accordance with Policy 17 - Place-making, Design and Amenity and Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
11. |
No part of the development hereby permitted shall be brought into use until the parking, turning and servicing areas are surfaced in a bound material with the parking bays clearly delineated in accordance with drawing number SCP - LFA - XX - XX - DR - A – 0102 S2 PO6. The parking, turning and servicing areas shall be maintained in the bound material for the life of the development and shall not be used for any purpose other than the parking, turning and loading and unloading of vehicles.
Reason: To ensure that adequate off-street parking provision is made to reduce the possibilities of the proposed development leading to on-street parking in the area in accordance with Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
12. |
No part of the development shall be brought into use until illustrative details of the siting and design of the bin and cycle storage facilities shall be submitted to and approved in writing by the Local Planning Authority and the development shall be constructed only in accordance with those details.
Reason: To ensure the satisfactory appearance of the development in accordance with Policy 10 – Design and Enhancing Local Identity of the Aligned Core Strategy Part 1 Local Plan 2014 and Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
13. |
No part of the development shall be brought into use until a scheme detailing the developments adherence to Secured by Design principles has been submitted to and approved in writing by the Local Planning Authority. All measures detailed in the scheme shall thereafter be implemented and within an agreed timeframe which shall be set out in the submitted details.
Reason: To reduce the potential for crime in accordance with Part 8 - Promoting healthy and safe communities of the National Planning Policy Framework 2021.
|
13. |
Any floodlighting installed and operated by way of this permission shall be installed and maintained in line with the current guidance from the institute of lighting engineers ‘Reduction of obtrusive Light’ guidance for the duration of the permitted use.
Reason: To protect nearby residents and road users from excessive light pollution in accordance with Policy 17 - Place-making, Design and Amenity and Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
14. |
The floodlit MUGA shall only be used at the following times: Monday to Sunday 08.30-21.00 only.
Reason: To protect nearby residents and road users from excessive operational noise and light pollution in accordance with Policy 17 - Place-making, Design and Amenity and Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
15. |
The pavilion building shall not be used except between 08.00 – 22.00 Monday to Sundays without the prior agreement in writing of the Local Planning Authority.
Reason: To protect existing residents from noise in accordance with Policy 17 - Place-making, Design and Amenity and Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
16. |
No construction or site preparation work in association with this permission shall be undertaken outside of the hours of 08:00-18.00 Monday to Friday, 08:00-13:00 Saturdays and at no time on Sundays or Bank Holidays.
Reason: To protect nearby occupiers from excessive construction noise in accordance with Policy 17 - Place-making, Design and Amenity and Policy 19 – Pollution, Hazardous Substances and Ground Conditions of the Broxtowe Part 2 Local Plan 2019.
|
16. |
The hereby permitted development shall be carried out in accordance with the recommendations contained within Section 6.3 of the Sustainable FRA and Drainage Strategy by Tunstall Smith King dated May 2023.
Reason: In the interests of flood risk in accordance with Policy 1 - Climate Change of the Aligned Core Strategy Part 1 Local Plan 2014 and Part 14 - Meeting the challenge of climate change, flooding and coastal change of the NPPF 2021.
|
17. |
The approved landscaping shall be carried out not later than the first planting season following the substantial completion of the development or occupation of the building, whichever is the sooner and any trees or plants which, within a period of 5 years, die, are removed or have become seriously damaged or diseased shall be replaced in the next planting season with ones of similar size and species to the satisfaction of the Local Planning Authority, unless written consent has been obtained from the Local Planning Authority for a variation.
Reason: To ensure the satisfactory appearance of the development in accordance with Policy 10 - Design and Enhancing Local Identity of the Aligned Core Strategy Part 1 Local Plan 2014 and Policy 17 - Place-making, Design and Amenity of the Broxtowe Part 2 Local Plan 2019.
|
|
NOTES TO APPLICANT
|
1. |
The Council has acted positively and proactively in the determination of this application by working to determine it within the agreed determination timescale.
|
2. |
The applicant is advised that the proposed will require a Food Registration. Please contact the Councils Environmental Health Department on Tel 0115 9173485.
|
3. |
The internal layout, design and construction of the premises must meet the current Food Safety and Health and Safety requirements. The applicant must therefore contact the councils Food and Occupational Safety Section on tel :01159173485.
|
4. |
The applicant is advised that the proposed may require a Premises Licence. Please contact the Councils Licensing Department on Tel 0115 9173485.
|
Supporting documents: