18 Brinsley Headstocks PDF 14 KB
To inform Members of the outcomes of the public consultation on Brinsley Headstocks.
Additional documents:
Minutes:
On 12 March 2024 a report was presented to Cabinet which requested approval for a public consultation to be undertaken regarding potential replacement options for the Headstocks. The proposed questions were approved, and the consultation was undertaken. The consultation was conducted using an online platform and paper questionnaires. The latter was distributed across various locations in the Borough. The options presented for replacement were a direct replacement with an oak framed structure, a direct replacement with a steel structure or a ground level interactive art piece.
It was stated that the importance of this to the cultural heritage of the area could not be underestimated. It was an imperative to demonstrate to future generations the debt of gratitude that was owed to those who had worked in the mine, and it was important to demonstrate this to future generations. It was further stated that the depth of feeling from the consultation could not be ignored, and it would be beneficial to have an interactive element to the amenity to enhance visitor experience.
RESOLVED unanimously that option 1, a direct replacement with an oak framed structure, funded from sources including section 106 contingencies, be approved.
Reason
The memorial would provide a fitting tribute to those who worked and gave their lives at the site.
Options considered and rejected
2. Direct replacement with a steel structure.
3. Ground level interactive art piece.